Hong Kong Institute of Vocational Education, Sha Tin (formerly Sha Tin Technical Institute)

Design for future flexible reconfiguration

Project Summary

  • Structural columns set at 7.2m x 7.2m grids for flexible future reconfiguration
  • Innovative ribbed floor slab design that yielded big savings in pile foundation costs
  • Provides ample headroom and high flexibility for building services installation

Project Details

Project Owner:
Hong Kong Government
Client:
Vocational Training Council
Year:
Completion: 1985
Size:
(Approx)

Floor Area: 29,300m2

Construction Cost:
(Approx)
HK$90M